Last month, the United States Air Force released a new artist rendering of its still-in-development B-21 Raider. The latest images of the heavy bomber came after it was announced in June that the first two Northrop Grumman B-21s had been completed at Plant 42 in Palmdale, California, and would soon be used in testing.
But don’t think for a second America’s adversaries didn’t catch those headlines, as Moscow is getting set for its own potential bomber PR push—and soon.
The Russian military has its very own stealth project in the works and is working on its own long-range bomber. On Monday, Tass reported that a demonstration model of the PAK DA aircraft would be assembled before the end of next year, while a new weapon system was also being developed for the ongoing project.
Currently, the experimental model is being built. The demonstration model will be ready by 2023,” a source in the Russian aircraft industry told Tass. “The subsonic PAK DA will be armed with hypersonic weapons. Besides, its flight will be aided by drones.”
There has been no official confirmation of the information provided to Tass, but in December 2019, Russia’s Deputy Defense Minister Alexey Krivoruchko said in an interview that the design of the PAK DA had been approved, and the Tupolev design bureau had already begun developing working design documentation. In May 2020, a source told Tass that production of the first experimental model of the new strategic bomber had begun.
Codename: Poslannik (Envoy)
The Tupolev PAK DA, which translates in Russian to ‘Prospective Aviation Complex for Long-Range Aviation’ and is codenamed ‘Poslannik’ (Envoy), is the Russian project to develop its next-generation stealth strategic bomber for the Long-Range Aviation branch of the Russian Aerospace Forces.
Similar to the American-built Northrop Grumman B-21 Raider, which is meant to replace the B-1 Lancer, B-2 Spirit, and B-52 Stratofortress, the PAK DA will eventually replace the Cold War-era Tupolev Tu-95 as well as the Tu-160M and Tu-22M3.
Development of the new bomber began in 2008, and according to some early reports, it was initially based on the Tupolev Tu-160. However, then-Prime Minister Vladimir Putin stated in a televised address that year that the bomber was an entirely new design.
In September 2009, the Tupolev Design Bureau was awarded a three-year research and development (R&D) contract to undertake studies for a completely original long-range bomber design rather than relying on legacy Soviet concepts.
As previously reported, Russian defense sources revealed last summer that PAK DA’s design had been finalized, following almost a decade of bureaucratic debate and fraught research and development work. Additionally, it was announced that the United Aircraft Corporation (UAC) had begun work on the first PAK DA model, with construction to be completed this year. In December 2020, it was also reported that as many as three PAK DA prototypes were already in production. However, that would seem to contradict this week’s news.
The World in the Crosshairs
Even as questions arise regarding the actual progress of the PAK DA program, experts have highlighted its potential capabilities.
Unlike the Tu-95 (NATO reporting name ‘Bear’), the PAK DA will reportedly have the ability to use its hypersonic weapons to strike targets potentially on the other side of the planet without even leaving Russian airspace.
Earlier this year, Russia Beyond reported that work was continuing on the first full-size prototypes and that the new ЬomЬeг would be built according to the “flying wing aerodynamic scheme,” thus perhaps not being all that different from the B-21 Raider in profile.
The aircraft would be capable of reaching subsonic speeds of up to 1,190 km/h or 740 mph. That would be slower than the speed of the Tu-160 strategic ЬomЬeг, but it would employ “intra-fuselage” weарoпѕ, which would deсгeаѕe its radar visibility.
Additionally, if the PAK DA could fігe its hypersonic weарoпѕ without leaving Russian airspace it certainly wouldn’t need to be the fastest ЬomЬeг in the world. Now as with every other Russian military program in the works, the question is whether Moscow will actually deliver on the һурe, and with enough units to make the project more than just an exрeпѕіⱱe PR stunt.